This Hermantown rambler on a wooded lot had two layers of old shingles on it. We stripped both layers down to the deck, which takes weight off the framing and lets the new roof lie flat. Then ice-and-water shield went along the eaves, new drip edge went on every edge, plumbing vents got new flashings, and the roof was finished in Owens Corning Duration shingles. The new roof was completed in June 2026.
- WhereHermantown, MN
- WorkRoof replacement (two-layer tear-off)
- CompletedJune 2026
- MaterialsOwens Corning Duration
What we found
- Two layers of old shingles on the roof of a rambler on a wooded lot.
What we did
- Stripped both old layers down to the deck. That takes weight off the framing and lets the new roof lie flat.
- Laid ice-and-water shield at the eaves, valleys and penetrations.
- Put new drip edge on every edge and new flashings on the plumbing vents.
- Finished with Owens Corning Duration shingles, backed by the Owens Corning warranty.