New wrap-around treated-lumber deck along the back of a single-story home
The new deck along the back of the house

This Hibbing home got a brand new deck along the back of the house. The posts sit on Diamond Pier DP-75 footings with galvanized post bases, which hold up through frost without digging deep concrete footings. The deck itself is 5/4 green treated decking with a post-to-post railing, a 2×6 top cap and 2×2 treated spindles, plus new stairs. The price included the permit, materials and clean-up, and the deck was finished in November 2024.

  • WhereHibbing, MN
  • WorkNew deck with stairs and railing
  • CompletedNovember 2024
  • MaterialsDiamond Pier DP-75 footings, green treated lumber
  • PermitPermitted and inspected
The job was in Hibbing. The map shows the area, not the home.

What we built

  1. Set the posts on Diamond Pier DP-75 footings and secured them with 6×6 galvanized post bases.
  2. Laid 5/4 green treated decking along the back of the house.
  3. Built a post-to-post railing with a 2×6 top cap and 2×2 treated spindles.
  4. Added new stairs.
  5. Pulled the permit, passed the inspection and cleaned up. All of it was in the price.

More photos

New deck with stairs and post-to-post railing
Stairs and post-to-post railing

Planning a deck in Hibbing?

Winter is a good time to plan a deck so it’s ready for summer. Estimates are free and done on site.