Roof edge, soffit and gutter after the new roof went on
After: the new roof edge and gutter

This older two-story home in Two Harbors had a roof that was leaking, and once the shingles came off, the boards underneath were not worth saving. We redecked every slope with new sheathing, then put ice-and-water shield at the eaves, valleys and chimney, rebuilt the chimney flashing, and added new drip edge, pipe flashings and ridge venting. The roof is Owens Corning Duration, and it was completed in September 2025, ahead of the North Shore winter.

  • WhereTwo Harbors, MN
  • WorkRoof replacement with full redeck
  • CompletedSeptember 2025
  • MaterialsOwens Corning Duration
The job was in Two Harbors. The map shows the area, not the home.

What we found

  • A leaking roof on an older two-story home.
  • Roof boards under the shingles that were not worth saving.

What we did

  1. Tore the old roof off down to the deck and traced the leak instead of patching it.
  2. Redecked every slope with new sheathing.
  3. Put ice-and-water shield at the eaves, in the valleys and around the chimney.
  4. Rebuilt the chimney flashing with step and counter flashing.
  5. Added new drip edge, new pipe flashings and ridge venting.
  6. Finished with Owens Corning Duration shingles, backed by the Owens Corning warranty.

More photos

Old roof over a two-story home with dark shutters
Before: the old roof
Worn shingles on the lower roof before the tear-off
Before: worn shingles on the lower roof
Lower roof edge and soffit at the corner after the roof work
After: the lower roof corner