Finished treated-lumber deck across the back of a two-story home
The finished deck across the back of the house

This East End home in Superior got a new deck across the back of the house. It is built with 5/4 green treated decking and a post-to-post railing with a 2×6 top cap and 2×2 treated spindles, which keeps the cost down and lets the homeowners stain it the color they want once the wood dries. Permits, materials and clean-up were part of the price, and the deck was completed in September 2024.

  • WhereEast End, Superior, WI
  • WorkNew deck with railing
  • CompletedSeptember 2024
  • MaterialsGreen treated lumber
  • PermitPermitted and inspected
The job was in Superior’s East End. The map shows the area, not the home.

What we built

  1. Laid 5/4 green treated decking across the back of the house.
  2. Built a post-to-post railing with a 2×6 top cap and 2×2 treated spindles.
  3. Pulled the permit, passed the inspection and cleaned up. All of it was in the price.

More photos

New deck and railing seen from the side yard
The deck and railing from the side yard

Planning a deck in Superior?

Winter is a good time to plan a deck so it’s ready for summer. Estimates are free and done on site.

Call Now Free Estimate